Turnkey
projects

Data Lab Relocation

WFL were engaged by Oracle EMEA in the role of Management Contractor to complete a Lab Relocation from the ground floor of Block C to the new location in Block B, Eastpoint Business Park. 

As Management Contractor, WFL were required to liaise with the Client’s Design Team, work with and develop the initial design in line with the client’s budget, complete a full tendering process for the Electrical, Mechanical & Building packages and make recommendations to the client. 

The following works were required:

  • Alterations to the main incoming ESB service between buildings
  • New trenching to facilitate cable installation from main switch rooms & new ESB supply to Block C
  • Alterations to the façade of Block B on the Ground Floor to create new goods inwards area
  • Alterations to the existing roof plant area in Block B to facilitate the new chiller and associated plant 
  • Complete strip out of all ceilings, floors and MEP services to the space on the Ground Floor of Block B to facilitate the new installation
  • Construction of new lab area to include ancillary rooms and construction of meeting rooms
  • Complete MEP fit out works for all areas to include AV to meeting rooms
  • Installation of New Hot Aisle Contained POD System to new lab area
  • Early delivery and powering of racks into existing Block C lab to facilitate the pre racking of the servers for relocation to minimise downtime
  • Completion of new lab in Block B to include all final commissioning prior to the racks being transferred from Block
  • Power down of all new racks in Block C and transfer to Block B over a dedicated weekend to minimise downtime
  • Completion and sealing of Hot Aisles with new racks
  • Final commissioning and hand over of lab

 

WFL also undertook the role of Project Supervisor for the Construction Stage [PSCS].

Acute Care Ward & ICU Expansion

WFL were engaged by St. Vincents University Hospital to complete an Acute Care upgrade to two wards in Block H in the hospital and also to expand the existing ICU by 2 No. isolation rooms. These works were carried out over two separate phases.

WFL were appointed as the main contractor on this project and were responsible for the PSDP, PSCS and all sub-contracts to the main contract. WFL completed the electrical contract and sub-contracted all other works.

Phase 1 of the project was carried out in a live hospital environment in the height of the Covid-19 national lockdown in April 2020. Phase 2 works were carried out in a live ICU ward. Both phases required high levels of co-ordination with the hospital technical and infection control departments. The works were designed and completed to current HTM and HBN regulations.

WFL provided IPS Power Units, Medical Trunking, Medical Pendants, Medical Gases, Nurse Call, Lighting, Emergency Lighting and General Power to 51 Acute Care Beds in Phase 1 and 2 No. ICU isolation rooms in Phase 2 of the contract.

CAT A Reinstatement

WFL were engaged by Oracle EMEA in the role of Management Contractor to complete a CAT A Reinstatement Project to a Ground Floor space in Block C, Eastpoint Business Park following the relocation of a Data Lab to another building. 

As Management Contractor, WFL were required to liaise with the Client’s Design Team, work with and develop the initial design inline with the client’s budget, complete a full tendering process for the Electrical, Mechanical & Building packages and make recommendations to the client. 

On selection of the Electrical, Mechanical & Building sub-contractors by the Client, WFL coordinated and managed the works to deliver the project on time and on budget. 

WFL completed the Electrical package directly while the Mechanical and Building packages were subcontracted. WFL also undertook the role of Project Supervisor for the Construction Stage [PSCS].

Book an Introductory Call