- client Davy Group
- location Banking Centre, Ballsbridge, Dublin 4
- project timeframe 18 Months
- consulting engineer Baker O' Reilly
- project value €4,400,000.00
Project Specifications
WFL are delighted to announce that we have commenced the electrical services installation of the shell & core and Cat A fitout works, in Facebook’s New Dublin HQ in Blocks E,F,G & H, in the Banking Centre Ballsbridge. This project includes the installation of a new MV Distribution centre for the blocks and a complete new LV Distribution system from the basement to the 5th Floor along with all other electrical services including Mains Distribution System, Containment System, Fire Alarm, Emergency Lighting, General Lighting, Lighting Controls, BMS, Lightning Protection, Under Floor Power Services, Electric Vehicle Charging Stations, CCTV, Door Access, Intruder Alarm, etc.
At WFL we have invested heavily over the past number of years in our in house Engineering & BIM Department which has allowed us to design and pre – manufacture numerous systems for our projects which ensures the highest level of Quality Control as items are Manufactured within Factory Environment, reduces waste which reduces our carbon footprint, improves Health & Safety by reducing the risk of Slips, Trips & Falls as there are no raw material off cuts lying around and reduces onsite installation time which benefits programme.
We have successfully completed numerous projects with our pre-manufacturing and we are implementing same on this project.
We look forward to delivering a successful project to our client DavyGroup along with Walls Construction and Baker O’ Reilly Consulting Engineers