• client HSE
  • location Brunel Building, Dublin, Ireland
  • project timeframe 4 Months
  • consulting engineer Arup Consulting Engineers
  • project value €580,000

Project Specifications

This high-specification office fit out of five floors of the iconic Brunel Building, in Dublin’s Heuston South Quarter, included modifications to the main distribution system, as well as the installation of general services, lighting, fire alarm, structured cabling, building management system, mechanical services power, UPS, door access, CCTV, and audio-visual wiring.

WFL worked closely with Arup Engineering to co-ordinate the installation and to make the client’s vision a reality. A key element of this project was it’s quick turn-a-round. The full fit-out of all five floors was completed in just 4 months.